Hidden Costs Homeowners Overlook When Rebuilding

Oct 20, 2025

-

Renee Ang

Hidden Costs Homeowners Overlook When Rebuilding a Landed House in Singapore

Rebuilding a landed property — whether it’s an older terrace in Lentor private estate, a semi-D in Sunset Way, or a bungalow in Watten Estate — is a major financial commitment. Most homeowners budget for structural works, carpentry, tiles, electrical, and kitchen fittings.

But actual rebuild projects across Singapore show a different reality:

Most homeowners overlook 10–20% of total costs — often due to hidden items that surface only during demolition or authority submission.

These hidden costs appear even more frequently in older neighbourhoods like Telok Kurau, Opera Estate, Serangoon Gardens, Seletar Hills, Clementi Park, and pockets of Bukit Timah, where infrastructure varies widely.

If you’re a condo upgrader rebuilding your first landed home, this list is essential. Here are the most commonly missed costs.

1. Soil Investigation (SI) Report, $3,000 to $10,000

For older landed estates with unclear soil conditions, SI reports are often required.

SI is especially common in:

  • East Coast (Siglap, Frankel, Telok Kurau)

  • Pasir Ris and Upper Changi landed pockets

  • Binjai Park / Hume slopes

  • Areas near old waterways (Springleaf / Upper Thomson)

If you’re adding:
✔ Another floor
✔ Attic
✔ A basement

the engineer will almost certainly request an SI report.

Why homeowners overlook it

Many assume the old foundation is fine — but Singapore’s soil varies greatly between districts.

2. Sewer Diversion or Upgrading, $5,000 to $25,000

Older houses often have outdated sewer connections.
Houses in:

  • Joo Chiat / Katong (conservation-adjacent zones)

  • Siglap / Frankel

  • Bedok South / Kew Drive

  • Opera Estate

are notorious for sewer line surprises during demolition.

Why it matters

PUB requires sewer diversion or upgrading before construction continues.
This can delay projects by 1–2 months if not planned early.

3. Neighbour Protection Works (NPW), $8,000 to $50,000

Required for properties with shared boundaries or party walls.

Common in:

  • Intermediate terraces (East Coast, Kovan, Serangoon Gardens)

  • Semi-Ds with tight setbacks (Binjai Park, Thomson Ridge)

  • Conservation-adjacent homes (Joo Chiat)

NPW includes:

  • Pre-condition surveys

  • Monitoring instruments

  • Structural supports

  • Insurance for neighbouring properties

Why it’s overlooked

Homeowners assume the contractor will “handle it,” but NPW falls under your cost.

4. ACMV / Ventilation Upgrades, $5,000 to $30,000

ACMV = Air-Conditioning & Mechanical Ventilation.
Ventilation is often more complex in older landed neighbourhoods with tight spacing:

  • Opera Estate — many deep terraced plots

  • Kovan Road estates

  • Telok Kurau — narrow intermediate terraces

  • Hougang / Rosyth landed belts

Hidden ventilation upgrades include:

  • additional exhaust systems

  • concealed ventilation shafts

  • bigger compressors for large homes

  • concealed AC trunking reruns

5. Electrical Load Upgrading, $2,000 to $10,000

Older estates may have insufficient electrical supply for a modern home with:

  • multiple aircon units

  • induction cooking

  • EV chargers

  • large fridges

  • smart home systems

Areas like Sunset Way, Siglap, and Serangoon Gardens often need SP upgrades.

This must be accounted for early to avoid delays during inspection.

6. Drainage Works & New Sumps, $3,000 to $20,000

Low-lying pockets of Singapore require enhanced drainage.

Common in:

  • Upper East Coast (near Bayshore MRT area)

  • Opera Estate / Bedok South

  • Clementi Park

  • Pasir Panjang low-lying zones

Older drains sometimes cannot cope with expanded GFA, so PUB requires new:

  • drainage channels

  • sump pumps

  • open drains

  • gully traps

7. Temporary Power, Water & Site Setup, $3,000 to $12,000

Before construction begins, contractors must install:

  • temporary power supply

  • water point

  • site toilet

  • hoarding

  • site office (if needed)

These add up quickly and are almost always forgotten in homeowner budgets.

8. Authority Re-Submission Fees, $500 to $5,000

Design changes = re-submission.

Areas with additional planning controls (e.g., near nature reserves or upcoming MRT stations) sometimes require more checks.

Examples include:

  • Springleaf (TEL)

  • Lentor (new town rejuvenation)

  • Beauty World precinct (Integrated Transport Hub masterplan)

Every re-submission costs time and money.

9. Difficult Access Conditions, Cost Varies Widely

Some estates have small roads or limited truck access:

  • Joo Chiat lanes

  • Opera Estate hills

  • Kovan narrow streets

  • Pasir Panjang old residential pockets

This increases:

  • demolition cost

  • cement pump cost

  • crane operation fees

  • material delivery time

If trucks cannot enter, smaller transport vehicles must be used (which cost more).

10. Structural Rectification After Demolition, $10,000 to $80,000

Once the old house is torn down, hidden problems may be revealed:

  • soft soil pockets

  • termite-damaged beams

  • foundation cracks

  • old retaining wall failures

  • underground water seepage

Common in:

  • older Bukit Timah homes

  • Siglap & Frankel terraces

  • Seletar Hills

  • Sunset Way / Hong Leong Garden Estate

These must be fixed before new construction proceeds.

11. Waterproofing Reinforcement, $5,000 to $30,000

Singapore’s heavy rainfall and humidity make waterproofing crucial.

Extra cost often arises when homeowners add:

  • roof terraces

  • balconies

  • bathrooms on every floor

  • open showers

  • large glass windows

Terraces in Low-lying East Coast or Pasir Panjang slopes require additional waterproofing layers.

12. Material Price Fluctuations, Up to +10%

Concrete, steel, aluminium, and glass prices vary with global supply conditions.

Longer projects (especially bungalows or basement homes) are more exposed to these fluctuations.

13. Additional Built-In Storage Needs, $5,000 to $40,000

Condo upgraders often underestimate how much storage they need in a landed home.

Extra carpentry such as:

  • under-stair storage

  • full-height bedroom wardrobes

  • utility storage room

  • concealed pantry storage

is usually added mid-way, increasing cost.

14. Landscape & External Works, $5,000 to $100,000

Many homeowners assume landscaping is “minor.”
But once the home is almost ready, they start noticing:

  • sloped driveway needing re-level

  • retaining structures

  • water features

  • planter box waterproofing

  • external lighting

  • auto-gate system

  • fencing replacement

Bungalows and corner terraces in areas like Sunset Way, Binjai Park, and Caldecott incur the highest external works cost.

15. Appliances & System Upgrades, $10,000 to $50,000

Commonly overlooked:

  • smart home system

  • CCTV / alarm

  • solar panels

  • water heater upgrades

  • booster pumps

  • EV charger preparation

  • kitchen appliances

Homes near new MRT growth zones (e.g., Lentor or Marine Parade) often receive premium upgrades due to future resale prospects.

Useful Links

For a breakdown of every cost category in a rebuild:
🔗 Cost to Rebuild a Landed House in Singapore (2026 Full Guide)

If you want to understand the common mistakes that lead to cost overruns:
🔗 Top Mistakes Homeowners Make When Rebuilding a Landed Home

To compare A&A versus full reconstruction (to avoid surprise cost jumps):
🔗 Rebuild vs A&A: Which Option Is Better?

If you need clarity on what the full rebuild process looks like:
🔗 Step-by-Step Guide to Rebuilding a Landed Property in Singapore