Company Standards
Singapore Construction Standards
Details of all standard material specifications
We pay attention to every detail of construction, selecting high-quality materials to ensure your home is strong, beautiful, and livable for a long time.



1.
Building Piles
A strong and stable foundation is essential for any landed home in Singapore, especially for A&A or reconstruction projects. We use high-quality driven piles installed according to BCA and engineering standards to ensure long-term structural integrity.
Selection of prestressed concrete piles (size I22) with depth not less than 21 metres, or based on certified soil investigation results.
Selection of prestressed concrete piles (size I22) with depth not less than 21 metres, or based on certified soil investigation results.
Selection of prestressed concrete piles (size I22) with depth not less than 21 metres, or based on certified soil investigation results.
Installation supervised by PE-endorsed engineering teams, ensuring compliance with Singapore piling codes and site conditions.
Installation supervised by PE-endorsed engineering teams, ensuring compliance with Singapore piling codes and site conditions.
Installation supervised by PE-endorsed engineering teams, ensuring compliance with Singapore piling codes and site conditions.
Proper load testing and quality assurance checks for settlement control and structural stability.
Proper load testing and quality assurance checks for settlement control and structural stability.
Proper load testing and quality assurance checks for settlement control and structural stability.
Guaranteed pile work carried out using approved equipment and certified specialists.
Guaranteed pile work carried out using approved equipment and certified specialists.
Guaranteed pile work carried out using approved equipment and certified specialists.






2.
Structural Work
We construct reinforced concrete structural elements that comply with BCA-approved structural plans, ensuring safety, durability, and compliance with Singapore’s high building standards.
Fabrication and installation of RC beams, columns, slabs, and structural frames as per PE certification.
Fabrication and installation of RC beams, columns, slabs, and structural frames as per PE certification.
Fabrication and installation of RC beams, columns, slabs, and structural frames as per PE certification.
Use of BCA-approved materials, including Grade 40 concrete and high-tensile rebar for better load performance.
Use of BCA-approved materials, including Grade 40 concrete and high-tensile rebar for better load performance.
Use of BCA-approved materials, including Grade 40 concrete and high-tensile rebar for better load performance.
Strict supervision during formwork, bar bending, casting, and curing to prevent cracks and structural defects.
Strict supervision during formwork, bar bending, casting, and curing to prevent cracks and structural defects.
Strict supervision during formwork, bar bending, casting, and curing to prevent cracks and structural defects.
Continuous site inspection and quality checks to meet Singapore’s structural audit requirements.
Continuous site inspection and quality checks to meet Singapore’s structural audit requirements.
Continuous site inspection and quality checks to meet Singapore’s structural audit requirements.
3.
Roofing Work
Professional roofing installation for Singapore landed houses, ensuring weather protection, durability, and proper thermal performance.
Installation of metal roofing, clay tiles, or lightweight roof systems based on architectural design.
Installation of metal roofing, clay tiles, or lightweight roof systems based on architectural design.
Installation of metal roofing, clay tiles, or lightweight roof systems based on architectural design.
Proper waterproofing layers, flashing, and ridge detailing to prevent water seepage during heavy rainstorms.
Proper waterproofing layers, flashing, and ridge detailing to prevent water seepage during heavy rainstorms.
Proper waterproofing layers, flashing, and ridge detailing to prevent water seepage during heavy rainstorms.
Compliance with local climatic considerations such as heat reflection and ventilation.
Compliance with local climatic considerations such as heat reflection and ventilation.
Compliance with local climatic considerations such as heat reflection and ventilation.
PE-approved structural support for roof trusses and rafters.
PE-approved structural support for roof trusses and rafters.
PE-approved structural support for roof trusses and rafters.






4.
Wall Work
Construction of external and internal walls using materials suitable for Singapore’s climate and building regulations.
Installation of RC walls, brick walls, AAC blocks, or drywall partitions depending on functional requirements.
Installation of RC walls, brick walls, AAC blocks, or drywall partitions depending on functional requirements.
Installation of RC walls, brick walls, AAC blocks, or drywall partitions depending on functional requirements.
Proper alignment, plumb level, and joint reinforcement for long-term stability.
Proper alignment, plumb level, and joint reinforcement for long-term stability.
Proper alignment, plumb level, and joint reinforcement for long-term stability.
Moisture protection for external walls to prevent seepage and mildew.
Moisture protection for external walls to prevent seepage and mildew.
Moisture protection for external walls to prevent seepage and mildew.
Quality finishing to prepare surfaces for plastering, skimming, or painting.
Quality finishing to prepare surfaces for plastering, skimming, or painting.
Quality finishing to prepare surfaces for plastering, skimming, or painting.
5.
Termite Extermination
A critical step for landed properties in Singapore due to high humidity and soil conditions that attract subterranean termites.
Application of soil treatment chemicals before foundation works, as required by NEA guidelines.
Application of soil treatment chemicals before foundation works, as required by NEA guidelines.
Application of soil treatment chemicals before foundation works, as required by NEA guidelines.
Installation of termite barriers around the perimeter to prevent infestation.
Installation of termite barriers around the perimeter to prevent infestation.
Installation of termite barriers around the perimeter to prevent infestation.
Use of BCA-approved anti-termite treatment suitable for new construction and A&A projects.
Use of BCA-approved anti-termite treatment suitable for new construction and A&A projects. Retail, and F&B Fit-Outs
Use of BCA-approved anti-termite treatment suitable for new construction and A&A projects. Retail, and F&B Fit-Outs
Long-term protection plan ensuring your home’s structure and timber elements remain safe.
Long-term protection plan ensuring your home’s structure and timber elements remain safe.
Long-term protection plan ensuring your home’s structure and timber elements remain safe.






6.
Floor and Wall Tiling Work
High-quality tiling work for bathrooms, kitchens, living areas, and outdoor spaces, ensuring durability and aesthetic appeal.
Installation of ceramic, porcelain, marble, granite, or homogenous tiles with proper leveling and alignment.
Installation of ceramic, porcelain, marble, granite, or homogenous tiles with proper leveling and alignment.
Installation of ceramic, porcelain, marble, granite, or homogenous tiles with proper leveling and alignment.
Use of waterproofing membranes, particularly for wet areas in compliance with HDB/BCA standards.
Use of waterproofing membranes, particularly for wet areas in compliance with HDB/BCA standards.
Use of waterproofing membranes, particularly for wet areas in compliance with HDB/BCA standards.
Correct grouting, tile spacing, and anti-slip options for safety.
Correct grouting, tile spacing, and anti-slip options for safety.
Correct grouting, tile spacing, and anti-slip options for safety.
Skilled craftsman installation to ensure long-lasting finishes with no hollow spots.
Skilled craftsman installation to ensure long-lasting finishes with no hollow spots.
Skilled craftsman installation to ensure long-lasting finishes with no hollow spots.
7.
Electrical and Communication Systems
Safe and compliant electrical installations for modern Singapore homes, meeting EMA and SCDF safety regulations.
Complete wiring works including lighting points, power points, DB box installation, and earthing.
Complete wiring works including lighting points, power points, DB box installation, and earthing.
Complete wiring works including lighting points, power points, DB box installation, and earthing.
Provision for data cabling, smart home systems, security cameras, and communication lines.
Provision for data cabling, smart home systems, security cameras, and communication lines.
Provision for data cabling, smart home systems, security cameras, and communication lines.
Use of certified materials and licensed electricians to ensure safety and compliance.
Use of certified materials and licensed electricians to ensure safety and compliance.
Use of certified materials and licensed electricians to ensure safety and compliance.
Testing and commissioning to confirm load capacity and electrical stability.
Testing and commissioning to confirm load capacity and electrical stability.
Testing and commissioning to confirm load capacity and electrical stability.






8.
Ceiling Work
Custom ceiling installations for aesthetics, lighting integration, and sound control.
Installation of false ceilings, L-box features, pelmets, and acoustic panels.
Installation of false ceilings, L-box features, pelmets, and acoustic panels.
Installation of false ceilings, L-box features, pelmets, and acoustic panels.
Proper suspension systems ensuring structural safety.
Proper suspension systems ensuring structural safety.
Proper suspension systems ensuring structural safety.
Integration of lighting points, air-con trunking, and maintenance access openings.
Integration of lighting points, air-con trunking, and maintenance access openings.
Integration of lighting points, air-con trunking, and maintenance access openings.
Moisture-resistant materials for areas such as kitchens and bathrooms.
Moisture-resistant materials for areas such as kitchens and bathrooms.
Moisture-resistant materials for areas such as kitchens and bathrooms.
9.
Stair Work
Safe and well-designed staircases that meet Singapore’s building code for residential properties.
Construction of RC staircases, steel stair frames, or custom timber stairs.
Construction of RC staircases, steel stair frames, or custom timber stairs.
Construction of RC staircases, steel stair frames, or custom timber stairs.
Accurate rise and run measurements compliant with BCA safety guidelines.
Accurate rise and run measurements compliant with BCA safety guidelines.
Accurate rise and run measurements compliant with BCA safety guidelines.
Installation of handrails, balustrades, and anti-slip finishes.
Installation of handrails, balustrades, and anti-slip finishes.
Installation of handrails, balustrades, and anti-slip finishes.
Smooth finishing and detailing for aesthetic appeal.
Smooth finishing and detailing for aesthetic appeal.
Smooth finishing and detailing for aesthetic appeal.






10.
Sanitary Ware and Bathroom Accessories
Professional installation of high-quality bathroom fixtures to ensure functionality and long-lasting performance.
Installation of WC bowls, basins, mixers, shower sets, bathtubs, and accessories.
Installation of WC bowls, basins, mixers, shower sets, bathtubs, and accessories.
Installation of WC bowls, basins, mixers, shower sets, bathtubs, and accessories.
Compliance with PUB plumbing requirements and correct gradient for drainage.
Compliance with PUB plumbing requirements and correct gradient for drainage.
Compliance with PUB plumbing requirements and correct gradient for drainage.
Waterproofing and sealing systems to prevent leaks and mould.
Waterproofing and sealing systems to prevent leaks and mould.
Waterproofing and sealing systems to prevent leaks and mould.
Neat and precise fitting for a premium bathroom finish.
Neat and precise fitting for a premium bathroom finish.
Neat and precise fitting for a premium bathroom finish.
11.
Paint Job
A clean, long-lasting paint finish using high-quality materials suitable for Singapore’s humid climate.
Surface preparation including patching, sanding, priming, and skim coating.
Surface preparation including patching, sanding, priming, and skim coating.
Surface preparation including patching, sanding, priming, and skim coating.
Application of weather-resistant exterior paint and low-VOC interior paint.
Application of weather-resistant exterior paint and low-VOC interior paint.
Application of weather-resistant exterior paint and low-VOC interior paint.
Professional techniques ensuring even coverage and durability.
Professional techniques ensuring even coverage and durability.
Professional techniques ensuring even coverage and durability.
Protection of surrounding surfaces and detailed finishing.
Protection of surrounding surfaces and detailed finishing.
Protection of surrounding surfaces and detailed finishing.