Service

Bungalow Rebuild Contractor Singapore

Why Rebuild a Bungalow Instead of Renovating?

Bungalows have high potential because of their generous land size and flexible buildability.

Renovation can improve certain areas,

BUT a full rebuild unlocks the complete potential of the land.

Here’s why many bungalow owners choose to rebuild:

1. Total Freedom in Design

Unlike terrace and semi-D properties, detached houses have:

  • Fewer setback limitations

  • More façade design freedom

  • Larger floor plates

  • Better layout flexibility

A rebuild allows architects to design without constraints of the old structure.

2. Maximise GFA Fully

Bungalows often have large unused areas.
A rebuild lets you expand vertically and horizontally, including:

  • Larger bedrooms

  • Bigger living & dining areas

  • Luxury master suite

  • Entertainment lounge

  • Home gym

  • Private study

  • Outdoor terrace

  • Roof deck

3. Add High-Value Luxury Features

Many modern bungalows include:

✔ Basement
✔ Pool
✔ Home lift
✔ Double-volume living area
✔ 4–6 bedrooms with ensuite
✔ Wet + dry kitchens
✔ Smart home integrations

These are hard to add without a full reconstruction.

4. Resolve Structural Aging

Older bungalows may have:

  • Foundation fatigue

  • Roof leaks

  • Spalling concrete

  • Outdated M&E

  • Termite issues

  • Poor waterproofing

Rebuilding ensures long-term structural stability.

5. Significant Increase in Property Value

A rebuilt bungalow can see a value uplift of $1M to $5M+, depending on land size and location.

Download Brochure

Our Bungalow Rebuild Specialisation

We provide a premium-grade, end-to-end rebuild service tailored for detached homes.

✓ Architectural Design Excellence

We design bungalows with:

  • Grand entrances

  • High ceilings

  • Spacious layouts

  • Luxury façade options

  • Landscape integration

  • Functional family planning

Every design is optimised for lifestyle, comfort, and long-term value.

✓ Structural Engineering for Large Homes

We specialise in designing:

  • Deep foundations

  • Retaining walls

  • Double-volume spaces

  • Cantilever structures

  • Large-span beams

  • Basement construction

✓ BCA, URA, SCDF, and PUB Submissions

We manage all professional submissions:

  • BCA structural

  • URA planning

  • SCDF fire safety

  • PUB drainage

  • LTA vehicle access (if required)

  • NParks tree protection

Our QP team ensures smooth approval.

✓ Safe & Efficient Demolition

Bungalows require careful tear down due to:

  • Size of structure

  • Proximity to neighbours

  • Larger debris volume

  • Underground utilities

We manage full demolition safely and systematically.

✓ Luxury Construction Work

We build with:

  • High-quality materials

  • Skilled craftsmen

  • Strict supervision

  • Robust waterproofing

  • Premium finishing

Everything from foundation to roof is handled by our team.

✓ Interior Design & Luxury Finishing

We create premium interiors with:

  • Custom cabinetry

  • Imported tiles & stones

  • Feature walls

  • Hotel-style bathrooms

  • Concealed lighting

  • Bespoke carpentry

✓ Project Management for High-Complexity Builds

Rebuilding a bungalow requires tight coordination.
We ensure:

  • Weekly site updates

  • Timeline control

  • Budget transparency

  • Quality inspections

  • Smooth communication

Bungalow Rebuild Cost in Singapore (2026 Guide)

Because of the larger land and complex structures, bungalow rebuilds have higher cost ranges.

Typical bungalow reconstruction cost:

Standard Bungalow Rebuild

$1.5M – $2.2M
Includes:

  • 2-storey + attic

  • Basic luxury finishing

  • Standard façade

Premium Bungalow Rebuild

$2.2M – $3.5M
Includes:

  • Attic

  • Basement

  • Pool

  • Home lift

  • High-end finishing

  • Feature façade

Luxury Bungalow Rebuild (High-end)

$3.5M – $6M+
Includes:

  • Multi-level layouts

  • Advanced smart home systems

  • Curtain wall façade

  • Imported flooring

  • Unique architectural features

  • Extensive landscaping

Cost Breakdown (What Goes Into a Luxury Rebuild)

1. Demolition — 5–8%

Large structure removal and disposal.

2. Foundation & Structural Works — 30–40%

Basements, deep foundations, RC structure.

3. M&E (Mechanical & Electrical) — 15–20%

Smart wiring, premium lighting, plumbing.

4. External Works — 10–20%

Pool, landscaping, boundary walls, car porch.

5. Façade & Windows — 10–15%

Curtain wall, large sliding glass panels, premium cladding.

6. Interior Finishing — 20–30%

Luxury carpentry, flooring, bathrooms.

7. Professional Fees — 5–10%

Architect, QP, engineering, authority submissions.

Bungalow Rebuild Timeline

A bungalow rebuild usually takes 20–36 months due to size and complexity.

1. Concept Design (2–3 months)

  • Lifestyle planning

  • Space distribution

  • 3D rendering

  • Material study

2. Authority Submission (3–6 months)

  • URA planning

  • BCA structural

  • PUB, SCDF, NParks approvals

3. Demolition (1 month)

Safe structural removal.

4. Construction (12–20 months)

  • Foundation

  • Basement

  • RC structure

  • Roof

  • M&E

  • Interior finishing

5. Handover (2–4 weeks)

Final inspection, cleaning, defects rectification.

Signature Design Features for Bungalow Rebuilds

1. Grand Entrance & Driveway

A statement façade with covered drop-off or porte cochère.

2. Double-Volume Living Room

A dramatic visual impact for luxury homes.

3. Basement Entertainment Areas

Home theatre, gym, wine cellar, games room.

4. Luxury Master Suite

Full-floor suite with his-and-her walk-in wardrobe.

5. Modern Kitchen Design

Wet + dry concept with island counter.

6. Outdoor & Indoor Integration

Sliding glass doors, seamless indoor-outdoor flow.

7. Private Pool & Outdoor Deck

Perfect for landed living.

8. Smart Home Integration

Lighting, curtains, AC, security system.

Why Choose Ember Earther Builders for Bungalow Rebuilds

✓ Specialists in High-Complexity Rebuilds

Bungalows require engineering expertise — we have it.

✓ Luxury-Level Workmanship

Premium carpentry, tiling, façade finishing.

✓ Strong Project Management

Timeline control, transparent communication, quality checks.

✓ Full In-House Team

Architects, engineers, designers, and builders.

✓ Deep Knowledge of Authority Requirements

We ensure smooth approvals for complex projects.

✓ Transparent Breakdown of Costs

Fair pricing with clear itemisation.

✓ End-to-End Service

From design to build, everything under one roof.

Frequently Asked Questions (FAQ)

1. How much does it cost to rebuild a bungalow in Singapore?

Between $1.5M – $3.5M+, depending on design and features.

2. How long does a bungalow rebuild take?

20–36 months from design to handover.

3. Can I add a basement or pool?

Yes — subject to engineering feasibility and URA approval.

4. What’s the difference between renovation and rebuild?

If more than 50% of the structure is changed → rebuild.

5. Do I need BCA/URA approval?

Yes — all bungalow rebuilds require multiple authority approvals.

6. Can I increase GFA?

Yes, as long as it follows URA envelope control guidelines.

Let’s Work Together

We're here to help you bring your construction project to life! Whether you have questions, want to discuss your ideas.