Service

A&A Contractor Singapore (Addition & Alteration Specialists)

What Are A&A Works? (Simple Explanation)

A&A works retain and modify an existing building rather than replacing it entirely. Whether proposed works are treated as A&A or reconstruction depends on the extent of the works and the applicable planning and building-control requirements. Your QP should assess the project-specific scope before submission.

Depending on the existing building and approved design, A&A works may include:

  • Adding a room or expanding your floor area

  • Rear extension of the house

  • Adding an attic or loft

  • Changing roof structure

  • Strengthening beams and columns

  • Upgrading toilets, kitchen, flooring

  • Reconfiguring internal walls and spaces

  • Extending car porch

  • Adding second living room or family area

  • Changing façade design

  • Upgrading M&E (electrical, plumbing, aircon)

 

Download Brochure

A&A vs Renovation vs Reconstruction, What’s the Difference?

Understanding the differences helps you decide the most suitable option.

Renovation

Minor works

Does NOT involve structural changes or extensions.

Examples:

  • Painting

  • Carpentry

  • Tiling

  • Non-load-bearing wall changes

A&A (Addition & Alteration)

Medium to major works

Involves structural and layout changes but keeps majority of the building intact.

Examples:

  • Floor expansions

  • Attic creation

  • Car porch extension

  • Replacing roof

  • Altering structural components

Reconstruction / Rebuild

Major works

More than 50% of the building is removed.
Requires full BCA & URA control.

Use this if your house is structurally old or you want a totally new design.

Which Should You Choose?

Choose A&A if:
✔ Your house structure is still stable
✔ You want to expand GFA without demolishing
✔ You want a faster and more affordable upgrade
✔ You want to modernise specific parts of the home

Why A&A Works Are Popular Among Landed Homeowners

Singaporean landed homeowners often choose A&A because:

1. Faster than a full rebuild - Most A&A projects complete in 6–12 months.

2. More affordable - A&A costs range from $150,000 – $600,000, depending on scope.

3. No need for major demolition - Less noise, fewer approvals, fewer neighbour issues.

4. Significantly improves property value - Modern layouts and extended spaces increase resale value.

5. Ideal for older homes needing upgrades - Especially for terrace houses and semi-Ds built 20–30 years ago.

Our A&A Services (Full Scope)

As a specialist A&A contractor in Singapore, we provide the full suite of A&A works.

Structural Works

  • Beam strengthening

  • Column reinforcement

  • Partial demolition

  • Roof extension or replacement

  • Second-storey extension

  • Loft or attic creation

Space Expansion

  • Rear extension

  • Kitchen expansion

  • Living room extension

  • Adding bedrooms or study rooms

  • Car porch extension

  • Side setbacks optimisation

Layout Reconfiguration

  • Changing internal walls

  • Open concept design

  • Walk-in wardrobes

  • Larger master bedroom

Exterior & Façade Upgrades

  • Modern façade cladding

  • Repainting

  • Window upgrades

  • Sliding glass doors

  • Balcony or terrace extensions

Interior Upgrading

  • Entire kitchen overhaul

  • Toilet revamp

  • Flooring

  • Lighting design

  • Built-in carpentry

  • Smart home installation

M&E (Mechanical & Electrical)

  • Plumbing upgrades

  • New aircon trunking

  • Electrical rewiring

  • Waterproofing

  • Solar panel preparation

Authority Submission & QP Services

We handle all approvals with:

  • BCA

  • URA

  • SCDF

  • LTA

  • PUB

  • NParks

So you don’t have to deal with the paperwork.

A&A Cost Guide (2026)

The cost of A&A works depends on the size of the property and the complexity of the changes.

Typical landed A&A cost range in Singapore:

Basic A&A

$150,000 – $280,000
Suitable for:

  • Light structural changes

  • Kitchen/toilet upgrades

  • Minor extensions

Moderate A&A

$280,000 – $450,000
Suitable for:

  • 1st or 2nd-storey extensions

  • Roof upgrades

  • New rooms or expanded floor area

Major A&A

$450,000 – $650,000+
Suitable for:

  • Attic creation

  • New façade

  • Major internal reconfiguration

  • Heavy structural reinforcement

Cost Factors Include:

  • GFA increase

  • Roof height changes

  • Size of extension

  • Foundation condition

  • Quality of finishing

  • M&E changes

  • Soil condition

We provide transparent breakdowns with cost justifications before work begins.

A&A Timeline — From Start to Handover

A well-managed A&A project usually takes 6 to 12 months.

1. Design & Planning (1–2 months)

  • Site inspection

  • Floor plan review

  • Concept design

  • Budget planning

2. Authority Submissions (1–3 months)

Depending on complexity.
We handle all BCA, URA, and other authority approvals.

3. Construction Phase (4–8 months)

  • Partial demolition

  • Structural enhancement

  • M&E installation

  • Finishing works

4. Final Handover (2 weeks)

  • Quality inspection

  • Touch-ups

  • Clean-up

  • Owner walkthrough

Do You Need Approval for A&A Works?

Yes, most A&A works require approval.

We handle the entire process with our QP (Qualified Person):

Approvals may include:

  • BCA submission

  • URA clearance

  • SCDF fire safety

  • PUB drainage

  • NParks setback requirements

The scope depends on the complexity of the alterations.

Frequently Asked Questions (FAQ)

1. What is the meaning of A&A in Singapore?

A&A refers to Addition & Alteration works — structural changes that do not exceed BCA’s reconstruction threshold.

2. How much does A&A work cost?

Most landed A&A projects cost $150,000 to $600,000 depending on scope.

3. How long does A&A usually take?

A typical project takes 6 to 12 months from design to completion.

4. Do I need approval from BCA?

Yes — all structural A&A works require approval.
We handle it fully.

5. Can I add a third storey or attic?

Yes — depending on your plot ratio and URA zoning.

6. Should I do A&A or rebuild?

If more than 50% of the structure needs to be changed → rebuild is recommended.

Let’s Work Together

We're here to help you bring your construction project to life! Whether you have questions, want to discuss your ideas.